OIL & GAS REPORT

Time to read
less than
1 minute
Read so far

OIL & GAS REPORT

Subheader body

Week of November 17-23, 2025

 

Posted in:
In-page image(s)
Body

Intents to Drill
None
Gas Completions
LIPSCOMB (FOLLETT, WEST, Cherokee) Bracken Operating, L.L.C., #1 Hoeppner, 5 mi NE from Follett, Sec 85, Blk 10, HT&B RR Surv, A-51, spud 11-8-1960, compl 10-1-2014, tested 9-15-2025, potential 60 mcf, 0.6 bbls cond, 1.0 bbls wtr, 50# ftp, 100# SIWHP, TVD 8894’, PBD 8000’ API 42-295-00193, Vertical Recompletion Reclass Oil to Gas
Oil Completions
MOORE (PANHANDLE, Red Cave) SNW Operating Company, #G 81 Masterson Red Cave, 4.5 mi NE from Masterson, Sec 41, Blk GM3, G&M Surv, A-455, spud 4-14-2022, compl 4-18-2022, tested 5-18-2022, potential 38 bbls-oil, 52 mcf, 10 bbls wtr, 175# ftp, 282# CP, TVD 2600’, PBD 2280’ API 42-341-33679, Vertical
MOORE (PANHANDLE, Red Cave) SNW Operating Company, #414 Sneed 3 & 4 Consolidated, 4 mi E from Masterson, Sec 4, Blk B10, EL&RR RR Surv, A-677, spud 4-5-2022, compl 5-25-2022, tested 11-20-2025, potential 3 bbls-oil, 1 mcf, 4 bbls wtr, 175# ftp, 50# CP, TVD 2300’, PBD 2231’ API 42-341-33672, Vertical