1 minute
OIL & GAS REPORT
Week of September 15-21, 2025
Intent to Drill
ROBERTS (MORRISON RANCH, Morrow Up.; HODGES, Morrow, Middle; MORRISON RANCH, Morrow, Lo.; PARSELL, Morrow, Upper; PARSELL, Morrow, Lower; ORISON, Morrow Uppr; MORRISON RANCH, Morrow Up. 9470; HODGES, Morrow, Up) Davis Operating Company, Inc., #3182 Mary T. Morrison, (640 acres) 1233’ FEL & 933’ FSL, Sec 182, Blk 42, H&TC RR Surv, A-1020, 22.7 mi N from Miami TD 10500’, (sgd. Weldon Waters 512-478-3456) Vertical Recompletion
Gas Completions
LIPSCOMB (LIPSCOMB, Cherokee Shale) Mewbourne Oil Company, #W001DM Michelle-Jones 91/86 A, 3 mi SW from Higgins, Sec 91, Blk 43, H&TC RR Surv, A-74, spud 5-5-2025, compl 7-1-2025, tested 8-18-2025, potential 1786 mcf, 325 bbls/cond, 1085 bbls wtr, 375# ftp, 375# CP, TVD 10148’, MD 19595’ API 42-295-34421, Horizontal
ROBERTS (MENDOTA, NW., Granite Wash) #5 Waterfield B, 14 mi NE from Miami, Sec 100, Blk C, G&M Surv, A-555, spud 3-5-2006, compl 8-21-2025, tested n/s, potential n/s mcf, n/s bbls/cond, n/s bbls wtr, n/s# ftp, n/s# CP, TVD 11182’, PBD 11070’ API 42-393-31808, Vertical Plug Back Shut-in Producer Well Record Only
Oil Completions
None